Skip to content
Home » Products » Peristaltic Pump Heads » YZ35 Peristaltic Pump Head

YZ35 Peristaltic Pump Head

■ Lead Fluid YZ35 pump head flow range 0.0013~13L/min, suitable for 73#, 82# tube, can be cascade multiple pump heads.
■ New loading structure of tube, easy and fast to replace tube and the tube will not deviation in the process of operation.
■ Pressure tube clearance can fine adjustment according to the tube size.Can adapt to small deviations of pump tube size.
■ PPS shell material, 304SS roller material, resistant to organic solvents and other corrosive liquids and other corrosive liquids.
■ Compact structure, durable,can meet the demand of high speed and long time running.
■Cascade two pump heads,install 60 ° dislocation between the rollers,can obviously reduce the pulse, and improve the transmission speed.

Flow: 0.0013~13L/min

Pump Head Material

Shell: PPS

Roller: SS304

Roller shaft: SS304

Flow Parameters

Tube material: Silicone,Pharmed,Norprene Chemical,Viton,A-60-G/F,Tygon E-3603 ,etc.

Wall thickness3.3mm

ID(mm) 9.6 12.7
Tube 7 3# 82#
mL/rpm 13 22
mL/min ( (Continuous w orking max 600rpm) 8000 13200

Above flow parameters are obtained by using silicone tube to transfer pure water under normal temperature and pressure,in actually using it is effected by specific factors such as pressure, medium etc. Above for reference only.

Installation Tube Method

Pump Head Specification

  • Channel: 1 channel (Multiple pump heads c an be used in serie s)
  • Roller: 3
  • Tubing Method: Whole tube
  • Tube clearance: Can be fine -tuned
  • Weight: 1725g
  • Bear Liquid Temperature: Less than 200℃
  • Corrosion Resistance: Resistance to acid,alkali and organic solvents

Dimension(mm)

Tube Life Comparison Table

Notes:
The above data are all test results obtained by Lead Fluid laboratory under normal temperature and pressure for the transmission of pure water, which are for reference only; the actual service life may be affected by specific factors such as pressure, temperature, medium characteristics, tube batch and wall thickness; for specific problems, please contact Lead Fluid engineers to get better technical support.
Statement:The final explanation right of above information belongs to Lead Fluid.